Media Advisory

WIS 23 Expansion – Urban Section

Location/limits: WIS 23 and various intersecting local roads between US 151 and Seven Hills Road

Description of work: This work is part of the WIS 23 4-lane, on-alignment expansion project in Sheboygan and Fond du Lac counties. Construction in the Fond du Lac urban section of the overall project includes the construction of WIS 23 additional lanes. Work also construction of a roundabout at WIS 23 and Wisconsin American Drive, a jug handle interchange with roundabouts at WIS 23 and County K, and a County K bridge structure over WIS 23. At WIS 23 and County UU, a diamond interchange with roundabouts and a bridge over WIS 23 will be constructed. Other work includes grading, drainage culverts and inlets, aggregate base, concrete pavement, and incidentals.

Traffic impacts: WIS 23 mainline will remain open with various shoulder and lane closures.

  • County UU will be closed beginning Monday, April 12.
  • US 151 shoulder and lane closures
  • County K shoulder and lane closures
  • Wisconsin American Drive median closure