• Wastewater Treatment

AUTUMN FISHER
SUPERINTENDENT

View Staff

About Us

MISSION STATEMENT
Our mission is to operate and maintain the Fond du Lac Regional Wastewater Treatment Resource & Recovery Facility in a cost effective manner, producing effluent water that meets or exceeds Wisconsin Department of Natural Resource standards and to utilize the biosolids generated in the treatment process in an environmentally beneficial manner. We will accomplish our mission safely and in a manner that serves our customers while promoting pollution prevention and environmental protection.
HISTORY
The City's first wastewater treatment plant, portions of which still serve the City as the Doty Street Pumping Station, was placed in service in 1913 about 1,500 feet from the current site.  The most recent update was in 2008 which makes it the fifth major project completed on the current site, including projects in 1928, 1949, 1964, 1975, and 2008.  Many elements of the 1949, 1964 and 1975 facilities were adaptively reused for the 2008 plant upgrade to provide added features at little or no cost.  These adaptive reuses save the rate payer millions of potential additional costs.

The City’s first wastewater treatment plant was placed into service in 1913. A portion of the plant still in use today is the Doty Street Pumping Station, located about 1,500 feet from the current site.
COMMUNITIES SERVED

City of Fond du Lac

Johnsburg

Town of Calumet

Town of Empire

Town of Fond du Lac

Town of Friendship

Town of Taycheedah

Village of North Fond du Lac

MAP OF SERVICE AREA USERS - OSG
Outlying Sewer Group (OSG) is a group of representatives from Townships and Sanitary Districts whose wastewater is treated by the regional wastewater treatment plant located in and operated by the City of Fond du Lac, Wisconsin.

The OSG includes 13 Sanitary Districts, 5 Townships, and 1 Village, all of which are adjacent to or near the City of Fond du Lac. Members are the Town of Calumet, Town of Empire, Town of Fond du Lac, Town of Friendship, Town of Taycheedah and the Village of North Fond du Lac.
FOND DU LAC REGIONAL WASTEWATER TREATMENT FACILITY

The Fond du Lac Regional Wastewater Treatment Resource & Recovery Facility serves the City of Fond du Lac and thirteen neighboring communities. Every day the wastewater treatment plant treats approximately 7-8 million gallons of wastewater in order to protect public health and the environment.

The 2008 project was the fifth major project on the current site including projects in 1927, 1949, 1964, and 1975. Elements of the 1949, 1964 and 1975 facilities were reused to provide added features at little or no cost.

Facilities from the 1949 plant as well as the 1974 plant were retained to provide additional treatment capacity for abnormally high flows at a low cost to system users. These facilities provide the necessary treatment to comply with permit requirements. During the flood of 2008 this facility provided effective treatment for 32mgd of flow for a 24 hour period, allowing for 34 mgd of flow routed through the plant to meet all permit requirements. The facility returned to normal operations one day after the storm surge subsided. Digestion facilities originally constructed in 1964 were recommissioned with the 2008 project to provide biosolids digestion and storage.

 

FOND DU LAC REGIONAL WASTEWATER TREATMENT PLANT STAFF
Our staff is comprised of a Superintendent, Operations Leader, Facilities & Maintenance Foreman, Industrial Pretreatment Coordinator, Administrative Assistant, Wastewater Treatment Operators, Maintenance Mechanics, Lead Laboratory Analyst , Lab Technicians, and Sampling & Monitoring Technician.
  • You can now view crime reports for the city of Fond du Lac. Click on the Crime Reports link at the left and you will be able to view reports for your area.
    Click here to learn more.

Top FAQs

  • 1. What are the winter parking restrictions in Fond du Lac?