Skip to main content

Arndt St Bridge Closure

The Department of Public Works in partnership with the WI Department of Transportation has contracted with Pheifer Brothers Construction to replace the Arndt Street Bridge between Lincoln Avenue and Satterlee Street. The Arndt Street Bridge will be closed to traffic Friday, May 31st for several months as the current bridge is razed and a new bridge is constructed.

As part of this project, motorists will notice a change in traffic signage on Brooke Street. Additional stop signs on Brooke Street will be placed at the intersections of Satterlee Street and Arndt Street. The additional stop signs will be in place to assist with traffic flow on to Brooke Street from Arndt Street and Satterlee Street.

Bridge replacement projects are some of the most difficult projects, as they greatly limit access to streets. Motorists are encouraged to plan ahead for traffic delays, as there will not be a detour. Local traffic will need to utilize other streets to navigate the closure.

Thank you for your cooperation during this construction project.

2019-05-30T14:18:28-05:00May 30th, 2019|