{"id":119,"date":"2019-01-21T16:53:11","date_gmt":"2019-01-21T16:53:11","guid":{"rendered":"https:\/\/www.fdl.wi.gov\/engineering\/?page_id=119"},"modified":"2024-07-10T09:38:26","modified_gmt":"2024-07-10T14:38:26","slug":"drainage-plan-application-fee-deposit","status":"publish","type":"page","link":"https:\/\/www.fdl.wi.gov\/engineering\/drainage-plan-application-fee-deposit\/","title":{"rendered":"Drainage Plan Application Fee &amp; Deposit"},"content":{"rendered":"<div class=\"fusion-fullwidth fullwidth-box fusion-builder-row-1 nonhundred-percent-fullwidth non-hundred-percent-height-scrolling\" style=\"--awb-border-radius-top-left:0px;--awb-border-radius-top-right:0px;--awb-border-radius-bottom-right:0px;--awb-border-radius-bottom-left:0px;--awb-flex-wrap:wrap;\" ><div class=\"fusion-builder-row fusion-row\"><div class=\"fusion-layout-column fusion_builder_column fusion-builder-column-0 fusion_builder_column_1_1 1_1 fusion-one-full fusion-column-first fusion-column-last\" style=\"--awb-bg-size:cover;\"><div class=\"fusion-column-wrapper fusion-flex-column-wrapper-legacy\"><i class=\"fb-icon-element-1 fb-icon-element fontawesome-icon fa-tint fas circle-yes fusion-text-flow\" style=\"--awb-circlebordersize:1px;--awb-font-size:28.16px;--awb-width:56.32px;--awb-height:56.32px;--awb-line-height:54.32px;--awb-margin-right:16px;\"><\/i><div class=\"fusion-text fusion-text-1\"><h3>Residential Drainage Plan<\/h3>\n<\/div><div class=\"fusion-text fusion-text-2\"><p>The City of Fond du Lac adopted Ordinance #3660 amending Chapter 325 Erosion Control and Stormwater Management relating to Drainage Plans on March 28, 2018. Amendments to the ordinance include, but not limited to the following information:<\/p>\n<ol>\n<li><strong>Review Fee Required.<\/strong> A review fee is required with the submittal of a residential lot drainage plan and shall be paid in an amount set by resolution of the City Council.<\/li>\n<li><strong>Drainage Deposit Required.<\/strong> A deposit is required for compliance with residential lot drainage plans and protection of public right-of-way infrastructure (including, but not limited to, sidewalk, driveway aprons, curb\/gutter, terrace landscaping, street pavement; and sanitary, water, storm facilities). The deposit shall be returned to the builder or property owner upon the final approved inspection of the lot drainage and public right-of-way infrastructure<u>.<\/u> If during final inspection, the City Engineer directs corrective work, and said corrective work is not completed, part or all of the deposit may be forfeited to the City of Fond du Lac for use in completing the corrective work.<\/li>\n<\/ol>\n<p>The Drainage Plan Application and Two (2) stamped Drainage Plans will need to be submitted to the City Engineering Division, 4th floor of the County\/City building located at 160 S. Macy St. for review and approval. The primary applicant is responsible for calling City Engineering \u2013 920-322-3470 or emailing <a href=\"&#109;&#x61;&#105;&#x6c;t&#x6f;:&#100;&#x72;&#97;&#x69;&#110;&#x61;g&#x65;&#64;&#102;&#x64;&#108;&#x2e;w&#x69;&#46;&#x67;&#x6f;&#118;\">&#x64;&#x72;&#x61;&#x69;&#110;&#97;&#103;&#101;&#64;fd&#x6c;&#x2e;&#x77;&#x69;&#x2e;&#103;&#111;&#118;<\/a> to schedule all inspections and close out the permit once work is complete.<\/p>\n<p><a href=\"https:\/\/www.fdl.wi.gov\/engineering\/wp-content\/uploads\/sites\/14\/2024\/02\/Drainage-Requirements.pdf\" class=\"mtli_attachment mtli_pdf\">Drainage Requirements Updated 2024<\/a><\/p>\n<p><a href=\"https:\/\/www.fdl.wi.gov\/engineering\/wp-content\/uploads\/sites\/14\/2024\/07\/Drainage-Plan-Application-Fillable.pdf\" class=\"mtli_attachment mtli_pdf\">Drainage Plan Application<\/a><\/p>\n<p><a href=\"https:\/\/www.fdl.wi.gov\/engineering\/wp-content\/uploads\/sites\/14\/2019\/01\/Drainage_Inspection_Appl-1.pdf\" class=\"mtli_attachment mtli_pdf\">Drainage Inspection Form<\/a><\/p>\n<p><a href=\"https:\/\/www.fdl.wi.gov\/engineering\/wp-content\/uploads\/sites\/14\/2019\/01\/Drainage-Requirements.pdf\" class=\"mtli_attachment mtli_pdf\">Drainage Requirements<\/a><\/p>\n<\/div><div class=\"fusion-clearfix\"><\/div><\/div><\/div><\/div><\/div>\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":29,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_relevanssi_hide_post":"","_relevanssi_pin_for_all":"","_relevanssi_pin_keywords":"","_relevanssi_unpin_keywords":"","_relevanssi_related_keywords":"","_relevanssi_related_include_ids":"","_relevanssi_related_exclude_ids":"","_relevanssi_related_no_append":"","_relevanssi_related_not_related":"","_relevanssi_related_posts":"","footnotes":""},"categories":[],"tags":[],"class_list":["post-119","page","type-page","status-publish","hentry"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.8 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Drainage Plan Application Fee &amp; Deposit - Engineering - Public Works - City of Fond du Lac<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.fdl.wi.gov\/engineering\/drainage-plan-application-fee-deposit\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Drainage Plan Application Fee &amp; Deposit - Engineering - Public Works - City of Fond du Lac\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.fdl.wi.gov\/engineering\/drainage-plan-application-fee-deposit\/\" \/>\n<meta property=\"og:site_name\" content=\"Engineering - Public Works - City of Fond du Lac\" \/>\n<meta property=\"article:modified_time\" content=\"2024-07-10T14:38:26+00:00\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data1\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/www.fdl.wi.gov\\\/engineering\\\/drainage-plan-application-fee-deposit\\\/\",\"url\":\"https:\\\/\\\/www.fdl.wi.gov\\\/engineering\\\/drainage-plan-application-fee-deposit\\\/\",\"name\":\"Drainage Plan Application Fee &amp; Deposit - Engineering - Public Works - City of Fond du Lac\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/www.fdl.wi.gov\\\/engineering\\\/#website\"},\"datePublished\":\"2019-01-21T16:53:11+00:00\",\"dateModified\":\"2024-07-10T14:38:26+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/www.fdl.wi.gov\\\/engineering\\\/drainage-plan-application-fee-deposit\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/www.fdl.wi.gov\\\/engineering\\\/drainage-plan-application-fee-deposit\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/www.fdl.wi.gov\\\/engineering\\\/drainage-plan-application-fee-deposit\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/www.fdl.wi.gov\\\/engineering\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Drainage Plan Application Fee &amp; Deposit\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/www.fdl.wi.gov\\\/engineering\\\/#website\",\"url\":\"https:\\\/\\\/www.fdl.wi.gov\\\/engineering\\\/\",\"name\":\"Engineering - Public Works - City of Fond du Lac\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/www.fdl.wi.gov\\\/engineering\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Drainage Plan Application Fee &amp; Deposit - Engineering - Public Works - City of Fond du Lac","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.fdl.wi.gov\/engineering\/drainage-plan-application-fee-deposit\/","og_locale":"en_US","og_type":"article","og_title":"Drainage Plan Application Fee &amp; Deposit - Engineering - Public Works - City of Fond du Lac","og_url":"https:\/\/www.fdl.wi.gov\/engineering\/drainage-plan-application-fee-deposit\/","og_site_name":"Engineering - Public Works - City of Fond du Lac","article_modified_time":"2024-07-10T14:38:26+00:00","twitter_card":"summary_large_image","twitter_misc":{"Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/www.fdl.wi.gov\/engineering\/drainage-plan-application-fee-deposit\/","url":"https:\/\/www.fdl.wi.gov\/engineering\/drainage-plan-application-fee-deposit\/","name":"Drainage Plan Application Fee &amp; Deposit - Engineering - Public Works - City of Fond du Lac","isPartOf":{"@id":"https:\/\/www.fdl.wi.gov\/engineering\/#website"},"datePublished":"2019-01-21T16:53:11+00:00","dateModified":"2024-07-10T14:38:26+00:00","breadcrumb":{"@id":"https:\/\/www.fdl.wi.gov\/engineering\/drainage-plan-application-fee-deposit\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.fdl.wi.gov\/engineering\/drainage-plan-application-fee-deposit\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/www.fdl.wi.gov\/engineering\/drainage-plan-application-fee-deposit\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.fdl.wi.gov\/engineering\/"},{"@type":"ListItem","position":2,"name":"Drainage Plan Application Fee &amp; Deposit"}]},{"@type":"WebSite","@id":"https:\/\/www.fdl.wi.gov\/engineering\/#website","url":"https:\/\/www.fdl.wi.gov\/engineering\/","name":"Engineering - Public Works - City of Fond du Lac","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.fdl.wi.gov\/engineering\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"}]}},"publishpress_future_action":{"enabled":false,"date":"2026-06-20 12:18:26","action":"change-status","newStatus":"draft","terms":[],"taxonomy":"category","extraData":[]},"publishpress_future_workflow_manual_trigger":{"enabledWorkflows":[]},"_links":{"self":[{"href":"https:\/\/www.fdl.wi.gov\/engineering\/wp-json\/wp\/v2\/pages\/119","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.fdl.wi.gov\/engineering\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.fdl.wi.gov\/engineering\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.fdl.wi.gov\/engineering\/wp-json\/wp\/v2\/users\/29"}],"replies":[{"embeddable":true,"href":"https:\/\/www.fdl.wi.gov\/engineering\/wp-json\/wp\/v2\/comments?post=119"}],"version-history":[{"count":0,"href":"https:\/\/www.fdl.wi.gov\/engineering\/wp-json\/wp\/v2\/pages\/119\/revisions"}],"wp:attachment":[{"href":"https:\/\/www.fdl.wi.gov\/engineering\/wp-json\/wp\/v2\/media?parent=119"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.fdl.wi.gov\/engineering\/wp-json\/wp\/v2\/categories?post=119"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.fdl.wi.gov\/engineering\/wp-json\/wp\/v2\/tags?post=119"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}